Shell & core renovation
Start with the actual condition of the shell. Establish room geometry, service routes and floor levels before selecting final materials.
One agreed scope connects preparation, engineering and final installation. Plan the work and material deliveries together, then check each stage before handover.

One agreed scope connects preparation, engineering and final installation. Plan the work and material deliveries together, then check each stage before handover.
Condition, access, material selection and the agreed scope determine the estimate and programme. A site assessment helps identify what is needed before committing to the work.

Start with the actual condition of the shell. Establish room geometry, service routes and floor levels before selecting final materials.

Inspect the developer’s preparation before continuing. Check levels, installed services and moisture conditions, then define the remaining scope.
The estimate follows the site assessment and agreed specification. Quantities, labour, materials and changes are considered separately.
Yes. The service scope can cover one trade or a coordinated package. Interfaces with existing work are assessed before the scope is agreed.
The programme depends on design, scope, site access, drying times and material lead times. A project-specific schedule is prepared after assessment.
The agreed scope can include preparation, engineering, finishing and final installation. The estimate lists each item; furniture and appliances are agreed separately.
A shell generally needs more preparation and engineering. In a white frame, the developer’s existing work is inspected first. The actual condition determines what can be kept.
A floor plan, photographs and your priorities are useful for the first discussion. Measurements and technical checks on site are still needed before an accurate estimate.
The responsibility for purchase, delivery, storage and acceptance is set in the project brief. Materials supplied by the client must match the agreed specification.
The changed work, materials, cost and schedule should be recorded and agreed before that work begins.