Renovation journey

Each stage has an agreed scope and a clear next step. The technical sequence is adapted to the property, the design and the selected materials.

01

Initial consultation

Discuss your property, priorities, intended use and budget. Agree what information is needed for the next step.

Stage outcomeA clear initial brief
Initial consultation
02

Site visit & assessment

Measure the space, assess existing structures and services, identify access and technical constraints.

Stage outcomeRecorded conditions and measurements
Site visit & assessment
03

Planning & design

Develop layouts, technical requirements and material specifications. A design project is included when required by the agreed scope.

Stage outcomeAn agreed specification
Planning & design
04

Detailed estimate

Calculate quantities, labour and material costs. Prepare a proposed programme and discuss how changes will be agreed.

Stage outcomeAn itemised estimate and proposed schedule
Detailed estimate
05

Contract & scheduling

Confirm scope, payment stages, responsibilities and checkpoints. Coordinate procurement and site preparation before work begins.

Stage outcomeA documented plan for delivery
Contract & scheduling
06

Structural & rough works

Demolition, partitions, plaster, screed, waterproofing and insulation. Coordinate the timing with hidden services; the order varies by project.

Stage outcomePrepared substrates and checked geometry
Structural & rough works
07

Engineering installations

Electrical, water, drainage, heating, ventilation and low-voltage routes. Test and document concealed installations before closing them.

Stage outcomeTested concealed systems
Engineering installations
08

Interior finishing

Prepare final surfaces, apply coatings and install tiles, flooring, ceilings and doors to the agreed specification.

Stage outcomeCompleted interior surfaces
Interior finishing
09

Final installation

Connect sanitaryware, lighting, switches and equipment. Complete built-in elements and adjust system controls.

Stage outcomeInstalled and operating equipment
Final installation
10

Quality control

Inspect concealed work and final finishes, test engineering systems and record any items to resolve before handover.

Stage outcomeAn inspection record and resolved comments
Quality control
11

Final handover

Clean the site, complete a joint inspection and hand over the documentation specified in the contract. Discuss the agreed aftercare arrangements.

Stage outcomeA space ready for its agreed use
Final handover
Discuss your project

Let’s buildsomething considered.

Tell us about your property, your ideas and the work you have in mind. The next step starts with a conversation.

Get a quote
Contact
RENCON+995 511 29 08 49info@rencon.geWhatsAppTelegram